Chronicle
On this page you can learn more about the house's history, which is probably at least 500 years old.
We estimated the age of the property based on construction phases that are still recognizable today and finds that have since been hidden again.
History of the house
The centuries-old farmhouse "Podere Colle All’Asino" was, for a long time—along with several other dwellings in the immediate vicinity—part of the nearby former Medici villa, "Spedaletto." Founded by a Christian religious order, "Spedaletto" originally served as a hospital and lodging for travelers on the "Via Francigena," the pilgrimage route leading from Germany and France to Rome. In the 15th century, Lorenzo de’ Medici ("Il Magnifico") acquired the Spedaletto complex, along with its associated lands and farmsteads, such as "Podere Colle All’Asino." He commissioned the most renowned architects and artists of the era—including Domenico Ghirlandaio (Michelangelo’s teacher)—to extensively renovate "Spedaletto" into a hunting lodge. Through his presence there, he also solidified his influence over the city of Volterra, which had only recently been conquered under his rule. About two centuries later, "Spedaletto" passed into the possession of the Corsini, a wealthy Florentine princely family (whose coat of arms still adorns the roof ridge of our house today). To this day, "Spedaletto" remains an impressive complex, consisting of three main buildings surrounded by smaller structures. From our house, one can see "Spedaletto" to the east, nestled within a small grove of trees. From an early period, farmers dependent on "Spedaletto" lived at "Colle All’Asino." As sharecroppers (*mezzadri*), they were required to surrender a large portion of their agricultural produce—such as grain, vegetables, fruit, and wine—to the Spedaletto estate. In exchange, they were granted the right to reside in the farmhouse. "Podere Colle All’Asino" has existed in its current form since 1933/1934. Prior to that, the "Donkey Hill" had undergone centuries of alterations and expansions across several generations. The site must have been inhabited since at least the mid-15th century—if not earlier; during drainage work in 2000, we discovered foundations that provide clues as to the likely age of the settlement. The southern exterior walls of the present-day house (facing Volterra) are the oldest surviving remnants of this early settlement, dating back an estimated 400 to 500 years. By the mid-15th century at the latest, the first settlement stood on the "Donkey Hill." At that time, the small homestead had a completely different layout than it does today. A small dwelling must have stood at what is now the southern corner of the house—coincidentally, a mimosa tree now blooms in February on that very spot, while beneath the surface, the original foundation walls—complete with traces of interior plaster—still remain. Diagonally opposite this dwelling, there would have been a small stable (perhaps for several donkeys—hence the name "Donkey Hill"?). In 2006, during our renovation work, we uncovered the floor of this approximately 40-square-meter stable, located beneath the floor of a later stable dating from the 1930s. Constructed from rough river stones, this original floor still exists today, lying beneath the northern half of our dining room and the restroom in our seminar room. Around the mid-16th century, the small dwelling was likely demolished, and the central, lower section of the house—which still stands today—was built as an extension next to the existing stable. On the ground floor, an arched gateway—still visible today within the seminar room—was installed to allow for the entry of carts, while the second floor served as a living space. The building’s entrance can still be seen today in the wall on the courtyard side. Around 1650, the building’s footprint may have been expanded via an addition toward the southwest. This extension likely housed a new kitchen, complete with an open hearth and an "earth refrigerator"—a square, cubic-meter-sized pit with an opening that tapers toward the top. It still exists today beneath the floor of the seminar room, on the southwestern side of the courtyard (positioned, as it happens, beneath the foosball table). From the outside, one can still see the back of what was once the open hearth (at the southwestern corner), as well as three windows added at that time (in the seminar room, facing toward Orciatico, and next to the arched gateway). The base of the structure from that period lay approximately one meter below the current ground level. Around the same time—or perhaps no later than this period—a new, separate small barn was built toward the northeast, near the site of the present-day utility pole. We have learned of this barn through accounts from contemporary witnesses. Two to three generations later—presumably in the early to mid-18th century—the existing residential building underwent its first expansion toward the northeast. The kitchen, including an open hearth, was then relocated to the center of what is now the dining room. From our current eat-in kitchen, one can still clearly discern the construction of the new exterior wall and its windows from that era. In the room known as "Giallo," the former, significantly lower roof ridge line remains visible, and some of the natural stones still bear the soot from the kitchen chimney. The area that previously served as the kitchen was likely converted into a stable, thereby increasing the size of the latter. In the early 1930s, all the farmsteads belonging to the Spedaletto estate underwent further expansion or renovation. The barn associated with the old farmstead was presumably demolished, and the original house was rebuilt on its existing foundations—this time with a greater height. "Podere Colle All’Asino" acquired its definitive, architecturally distinct form through a further expansion toward the northeast (now the eat-in kitchen), the addition of a large cowshed on the southern side (now a seminar room), and a stable for other livestock—along with storage and utility space—in the center of the building (now the dining room). A new, larger barn was constructed centrally opposite the main house; both it—save for a modern roof—and the original drinking-water cistern remain intact to this day. At that time, several families lived at "Colle All’Asino." Rainwater from the roof was collected in a large cistern in front of the house, serving as the primary supply of drinking water. Two large ponds, replenished by winter rainfall, provided water for the livestock. Naturally, there was no electricity. The new, larger ground-floor stable could accommodate approximately a dozen cows. Their urine was channeled via an underground drainage system to a manure heap located below the house to the south. During the winter, the only source of heat was the large hearth in the eat-in kitchen, which shared a wall with the stable. The heat radiating from the cows below helped the residents in the rooms above endure the winter, with its frigid northern winds. According to accounts from one of the last inhabitants of "Colle All’Asino," despite the proximity to the warmth-generating cattle, an immense quantity of firewood—painstakingly hauled to the property throughout the year and stacked in front of the house—was consumed by the open kitchen fireplace (which still exists today, though without its original large hood). In the evenings, all the residents would gather beneath this expansive chimney hood—the only place in the house where one could find warmth. Following the Second World War, the *mezzadria* (sharecropping) system was abolished. By the mid-to-late 1950s, the industrialization of agriculture triggered an exodus from the countryside: fewer and fewer people were needed to work the land. Eventually, only one family remained at "Colle All’Asino"—Amadeo, his wife, his grandfather, and their five children. As the need arose to keep more livestock and store larger quantities of hay and straw, some of the rooms in the house—no longer required for living—were repurposed for these needs; humans and animals increasingly shared the same space. By the end of the 1960s, the young adults had moved away, and in the 1970s, the *podere* (farmstead) "Colle All’Asino" was abandoned entirely. The property then served as a storage area for agricultural machinery and equipment. Meanwhile, the surrounding fields were consolidated into larger plots, taking on the layout we see today. However, due to neglect and the ravages of the elements—which caused two-thirds of the roof to collapse—the "Podere Colle All’Asino" fell into an increasing state of disrepair over the years. Sergio—our eyewitness, who shared vivid accounts of his memories and the hardships of that era—now lives in Orciatico; he was the last of the five children to leave the family home, in 1970. His sister, Silvana, who now resides in La Sterza, eventually became the owner of the house. In 1998, we discovered "Podere Colle All’Asino."



Lajatico and Orciatico also boast a history spanning many centuries, dating back to around 1000 AD. Those wishing to test their Italian skills will find something useful in the following PDF. Perhaps, however, the accompanying images will suffice to give an idea of the eventful past of Lajatico and Orciatico.
Our renovation
Since 1999, we have been restoring the former ruin during our holidays, or whenever we had more time, sometimes with the help of many friends - and usually with great joy!
Early on, we planted numerous trees, whose shade we enjoy today. From April to November 1999, we renovated the collapsed roof of the house. In the following years, from 2001 to 2003, interior walls were rebuilt, and the floor, which had been badly damaged by the roof collapse, was renewed and replaced. A room on the upper floor was converted into a large bathroom, and the former storage room there became a small bathroom. The former toilet and adjacent pigsty in a former room (!) became our room "Rosa." The two south-facing rooms were combined into one large room and are now our room "Grande," or the dormitory for kids. In 2002, basic maintenance work was carried out on the equally dilapidated barn, which also received a new roof. Today, there is also a small dormitory in the "turret" of the barn. From 2006 to 2010, the former stable and the central storage room in the house were converted into a seminar room and dining room. In 2013 and 2015, we enlarged four of the small former stable windows into floor-to-ceiling panoramic windows, thus completing the work in the basement. In 2018, we transformed the former manure storage area from the 1930s into a barbecue area and sun terrace with panoramic views by laying a patio floor. In 2009 and 2019, we celebrated with a large party each year with all the friends and relatives who had helped us over the years—the majority of the restoration was now complete! From 2019 to 2024, we worked on a small sauna in the extension to the former barn, which serves us well during our winter stays! Starting in 2021, we added the vineyard below the barn. However, we've had to replant some vines repeatedly, as they suffered damage from drought, wind, or browsing animals in their first year. And even on vacation, the question remains: Is there anything else to do? Luckily, there's always some small project we can find! And we're always happy to welcome anyone who wants to help us out!

Chronicle 1998 - 2025
Anyone who'd like to learn more about our renovations will find what they're looking for below! Here you'll find detailed descriptions of the construction progress and lots and lots of photos...
Enjoy reading our photo chronicle 1998-2025!
1998
The ruin
First clean-up work during the vacation
-
Camping outdoors
-
Struggle with pigeons, mice, wind and weather
-
Connection to the power pole and temporary electrical cabling
-
Removal of the floors damaged by the roof collapse on the upper floor
-
repair the path with construction debris
-
Disposing of agricultural waste
-
Campfire and waste disposal fire in the yard
-
Knock off the plaster on the inside
1999
Preparatory work
-
Scaffolding and crane construction made from scrap iron
-
Removal of sandstone window sills, shutters, doors and other building materials from a demolished house
Roof construction house
-
Arrival in April with a truck full of materials
-
Camping in the cowshed
-
Temporary connections to the water supply and construction of a temporary bathroom in the barn extension
-
Demolition of the old roof truss and the dilapidated upper masonry - repair and rebuilding of the upper wall sections - further removal of the interior plaster - a reinforced concrete ring beam around the house - 20 new roof beams, each with its own name, and 50 rafters - brickwork in the spaces between them - application of the "lost" brick sheathing ("tavelle") - reinforcement and concreting of the roof - insulation with natural cork and roofing membrane - completion in November with the tile roofing "embrici e tegole" (partly historical, partly new material)
-
In parallel, stonemasonry work was also carried out: new window sills were made from the removed sandstone window sills (special thanks to Christoph and Thomas!).
-
All of this was only possible with almost 70 visitors and helpers, long night shifts, extended evenings off, midday naps and a tanker truck full of construction beer.
We could have done without the mosquito and "flying ant" plagues, though!
First plantings
Before the turn of the millennium 1999/2000: The only remaining tree on the "Eselsberg", the large cypress in front of the kitchen, gets company: planting of the first trees and the first row of cypresses behind the house.
New Year's Eve party 1999/2000
The local carpenter just barely manages to install the new windows in time for the planned celebration – however, a gap remains between the window sills and the windows, which we can't properly seal before New Year's Eve – brrr!
2000
Cleaning the walls in preparation for plastering, window shutters
in a long summer with the first construction worker baby, Luca:
-
Remove the remaining old plaster from the interior and pressure wash the interior walls (Thanks Thomas!).
-
Painting window shutters (thanks to Gabi, the two Anettes, Uli, ...).
drainage
-
In October: excavating around the house and removing all historical obstacles,
-
Installation of drainage around the house with simultaneous correction of the ground level: creation of the terrace in front of the house.
-
Many thanks to Thilo and Thomas!
2001
Partition walls in the upper floor of the house
-
Rebuild partition walls
-
Laying the new electrical connections
-
Replastering the walls
2002
Roof construction of former barn
Several months' stay: Demolition of the old, dilapidated roof truss and the crumbling upper masonry
-
Masonry construction with ring beam including reinforcing steel
-
Construction of the new roof truss
-
Covering with terracotta cladding
-
Reinforcement and concreting
-
Insulation
-
Covering with the traditional and original roof tiles
Many thanks to our "interns" André and Birgit, to Ole, Tanja and Thilo!
Attic house 1st Floor
... and while we're on the subject of concrete work:
-
a new screed on the upper floor of the house, with prior installation of the bathroom wastewater connections and underfloor heating! And a big thank you to André and Birgit for cleaning the tiles "on the side"!
-
Installing new (old) interior doors. Now the rooms even have a door!
2003
Re-laying of the terracotta floors on the upper floor
Together with the Italian experts Fabio and Uliviero, during the Carnival holidays. And thanks for the catering, Sabine!
Spring: Another construction worker baby has joined the family! Hello Matteo!
In the summer: Re-laying the floor in the large bathroom and tiling, together with the Italian floor layer Secondo.
Furthermore: Additional plantings, 2nd row of cypress trees towards Orciatico as wind and sun protection.
2004
Wastewater system and sewage treatment plant
-
Laying the sewage pipes in the yard with grease separator and septic tank - many thanks to Tanja and Thilo!
-
Sanitary connections in the upper floor of the house and completion of the small bathroom with connection of a temporary water boiler.
-
Renovation and painting of the old doors on the upper floor.
-
Renewal of the access road by the municipality.
-
Continuation of outdoor facilities:
-
Cypress planting continued, 2nd row including natural stone wall (Thanks Elmi!)
-
Planting of the pine "grove".
-
2005
Various "smaller" projects and a summer of "dolce far niente"
Brickwork for the new sink in the kitchen, grouting of the kitchen walls. The barn is getting a second, more solid concrete floor in the "turret".
Summer holidays:
-
New windows from the local carpenter
-
Paint the shutters to temporarily seal the entrances.
-
Sanitary fittings in the large bathroom, completion
Autumn holidays:
-
Renovation of the natural stone terrace wall (this was only temporarily piled up during the drainage construction)
-
Further plantings and pine groves, the second one after over-fertilization of most of the trees
2006
Mattress storage on the upper floor
Pentecost holidays
-
Laying the old parquet floor
-
Beginning of our mammoth project: conversion of the former stable into a seminar room, with the stable being cleared out to serve as storage and workshop space.
Floors of the seminar room and former barn
Things progress very quickly as the summer progresses:
Excavation of the old stable floor took place in June. Thanks for the support, Thilo!
And while we're at it, we're also going to put a concrete floor in the former barn.
In July, excavation of the barn floor, preparation of installations and placement of gravel layers (the huge piles of gravel have to be brought into the house and the barn); early departure due to injury!
Work continues in August with floor insulation, reinforcement, laying of underfloor heating, and concreting in the house and barn.
Carla and Max
And what else happened on the side! The "Eselsberg" is getting another new arrival: Another construction worker's baby on the "Eselsberg": Ciao Carla!
House shutter renovation - Our "intern" Hans is sanding and repainting the shutters. Thanks for this not very enjoyable job!
Tractor "Max": We're buying a tractor – built in 1962: a Fiat 441 R! It will soon be christened "Max." Thanks, Thilo and Philippo :-)
2007
Easter holidays: a new mower: The Max tractor now comes with a mower – professional grounds maintenance is now the order of the day!
Current status of the seminar room:
-
Carnival and Easter holidays: "Shell construction" of the lower toilet. Thanks to Luca and Matteo, the youngest construction workers on Eselsberg!
-
May: Preparation for creating a doorway in the dining room to the terrace, cleaning the walls and ceilings of old plaster, plastering the walls of the seminar room by a local company
-
During the Pentecost holidays: painting the metal ceiling beams. What a job! Many thanks to Tanja and Sigi for their patience!!
-
During the summer holidays: Final breakthrough for the new patio door in the newly created dining room: Thanks to Melf, Tronje, Luca, and Matteo! Installation of the new patio door by the local carpenter.
-
The unfinished toilet will get a small window, sanitary installations for the lower toilet, tiles (December, thanks Markus!).
Other work:
-
In summer: Redesign of the stair base in the kitchen, including demolition of the old stair support wall in the kitchen (thanks Aaron and Luca!) and rebuilding the support wall and plastering in December.
-
Sanding and painting the barn shutters: Thanks to Christin and Gabi!
-
In December: Barn: Installing the shutters on the barn's turret. Thanks to Markus!
-
Energy room: Finally, there's a new, old but professional electrical fuse box!
-
The old cooler box is no longer needed!
2008
Kitchen
-
In July: wall heating and plastering of the old brick wall around the open fireplace
-
Sabine is sponsoring a new kitchen window
Seminar room floor, ceiling and work area
-
February: Lay terracotta rubble stone from the upper floor, salvaged from the roof collapse, in the dining room.
-
Summer: Grouting the ceiling tiles - spraying the ceiling and walls with lime paint
-
December: Build the "work unit" in the seminar room and pour the screed in preparation for the parquet floor.
2009
Enclosing the seminar room supports with bricks and laying a wooden floor
-
Long Carnival break! Enclosing the original rusted metal supports, repointing the walls of the former troughs, final electrical installations in the seminar room, plastering and laying the floor in the toilet, laying the remaining terracotta floor in the seminar room
-
In May: Work begins on laying a former gymnasium wooden floor. Thanks to Martin!
-
Finishing the parquet flooring during the Pentecost holidays. The children helped a lot again! Thanks Jakob, Franziska, Luca, and Matteo!
-
In December: Tiles were laid in the former feeding troughs. Thanks, Markus!
Kitchenette and mattress storage barn, 10 years Colle All`Asino, olive grove
-
July: Brickwork for the new kitchen unit - now we finally have enough work surface in the kitchen!
-
Barn: Laying of parquet flooring in the turret - just as it's finished, a view of the Andrea Bocelli concert that's just beginning!
-
August: "Dounkey Mountain" Festival - we're celebrating 10 years of construction! The Eselsberg Festival with many friends who have helped and supported us during the construction over the last ten years!
-
Demolition of the former bathhouse at the barn: But hardly had the festival ended when the almost collapsing wall of the barn extension and our first temporary bathhouse from 1999 was demolished.
-
November: Planting of the olive grove with 25 trees
2009-2014
Basement and garage for tractor Max
2009
-
Autumn holidays: Drainage of the cellar under the barn, uncovering of the dilapidated cellar entrance
2010
Summer holidays: Excavation and concreting of the base slab (Thanks Thomas, Silvia, Rutger, Max, Luca!)
Starting the construction of the side walls and filling the stones with concrete (thanks to Thilo and Markus for the many, many buckets of concrete)
2012
Summer holidays: Completion of the brickwork and construction of the roof, piecing together a gate from the old cellar door
2013
Autumn: Is rainwater leaking into the basement? Or have we discovered a spring? It smells like work!
2014
The hottest Pentecost holidays ever, with excavators and exhaust fumes: Second, deeper basement drainage work. During the excavation for the very deep drainage pipe, they also accidentally hit the drinking water line to the house... Luckily, we've developed a close relationship with the local water company, as our water pipe is increasingly leaking! And this isn't the first time the water company has had to come out... Many thanks to Siggi, Thilo, Phillippo, and Luca!
Autumn: Hooray, even after heavy rain the cellar stays dry. Mission accomplished!
2010
Seminar room: Metal door, First major olive harvest
-
Sören still needs this year to finish the metal door (built between 2008 and 2010) between the dining room and the seminar room... Sometimes it was best to stay out of his way, otherwise it would have been dangerous ;)
-
One might now say: completion of the conversion of the stable into a seminar room! However, the seminar room wasn't "finally" finished until 2015 with the enlargement of four of the six small stable windows, see below...
-
House and yard: Pond maintenance (goal: bathing quality)
-
First substantial olive harvest and our own olive oil from the trees planted in 2000!
Otherwise, not much was happening on the construction site due to the German construction situation!
2011
A year without major projects :)
Art in architecture, garden maintenance, barbecuing and chilling out
2013-2015
Enlarged windows in the house
2013, Summer holidays
-
Enlargement of the small window in the kitchen
-
From the window in the large mattress storage area on the upper floor, there is an exterior door with a French balcony.
-
Two of the six small stable windows in the seminar room are floor-to-ceiling windows
2015, Summer Holidays
-
We are completing the renovation of the former large stable into a seminar room by enlarging two more stable windows (thanks to Thilo and all the rubble shovelers like Bärbel, Sabine, Ute, Max, Luca, Matteo; Sonja for painting the shutters)!
2016
-
February: New glass door to the courtyard in the dining room: Eselsberg is now almost mouse-proof!
-
May: New shutters for the seminar room - thanks to the Swiss Leo team and Luca for the final assembly!
-
June: Conversion of the former courtyard door into dining room shops and completion of the natural stone wall by the outdoor bathroom, 1st renovation of the window shutters on the patio door - Thanks Benni!
-
Summer holidays: Protective water basin outside and entrance area with the old stable tiles
-
Autumn holidays: Record olive harvest - 14 liters :) Connection of the wood-burning stove in the dining room
Summer holidays
Laying of pipes for the new solar system, various concrete work around the house
Thank you Thilo and the entire support team!
various works around the house including the church railing for the barn turret
Restoration of the old bread oven with a new opening, tiling of the outdoor washbasin
2017
Renewal of drinking water pipes
Pentecost holidays
-
Water pipe renewal to the house: The dilapidated water pipe leading to the house has been replaced. Many thanks to Christoph and Luca!
Earthworks, foundations for outdoor pool and terrace
Summer holidays
Laying of pipes for the new solar system, various concrete work around the house
Thank you Thilo and the entire support team!
various works around the house including the church railing for the barn turret
Restoration of the old bread oven with a new opening, tiling of the outdoor washbasin
2017-2018
Terrace overlooking Volterra:
Summer 2017: Excavating, leveling and concreting
Summer 2018: Laying the patio slabs
-
Thanks Clemens for the initial support! Pulling grass, burning grass, treating grass with chemical herbicides...
-
The use of 1.5 pallets of cement and lime, 3 cubic meters of sand, makes a total of 60 large concrete mixers = 120 wheelbarrows of concrete, which, along with several old bricks for leveling, is placed under the 3 pallets of granite slabs.
-
1/2 cubic meter of fine sand for grouting
-
One trailer axle broke thanks to one cubic meter of fine sand and Fausto from the construction company, who flattened the sand with the large wheel loader bucket because he meant well.
-
Thanks to the Munich dream team with Philippo, Maja and girlfriend, Tanja and Thilo for their help with grouting in what felt like 45 degrees in the shade and during the hottest part of the day!
2017-2018
"Library" as a multifunctional room
The "library" wall will be a real year-long project!
2017
-
February: Creating a basic framework for the new partition wall
-
Easter: Easter holidays and important discussions for the design of the partition wall :)
-
Pentecost holidays: Extension of the basic framework, insulation and lightweight cladding - thanks Christoph and Luca!
-
November: Glazing and plastering, painting and installation of the sliding door - thanks to Clemens and Thomas, Romina and Luca
2018
-
Carnival holidays: Applying the finishing plaster - Thanks Markus!
-
Easter holidays: Painting the walls - Thanks Milena and Vitus!
-
Pentecost holidays: Attaching the frame strips and... it's finished! :)
2018
"Vent'anni": 20 years of "Colle All Asino"
-
The construction work around the house is more or less complete, although one or two walls inside the house still need to be grouted!
-
The approximately 150 trees and shrubs we planted are now growing vigorously; wind, drought, waterlogging and browsing by wild animals no longer bother most of the trees too much!
-
Unfortunately, we already had to replant one of the first large trees after a winter storm blew down our beautiful mimosa at the end of 2017 - everything has its time and repeats itself...
-
And then there was the access road, which we started repairing again in 2018...
-
A property like this is never truly finished. But that too has its charm and creates opportunities for further encounters with the many hardworking and friendly helpers on Eselsberg. Let's look forward to the next 20 years!
Now we're focusing on future "smaller" renovations (if only those darned shutters didn't always have to be painted).
We are looking forward to a good olive harvest in autumn with ever more of our own olive oil.
Many thanks to all the supporters of "Eselsberg" who have supported us for many years and remained loyal, and of course to all the construction helpers, patient other supporters and cooks, without whom we would never have progressed so far and "so quickly"!
We look forward to many more wonderful stays together with all the helpers and guests who will enjoy the special atmosphere of the "Eselsberg" with us!

2019
"Eselsberg-Vent'anni", Renewal of access road, outdoor pool and sauna
August 2019: In keeping with tradition, we celebrated the 20th anniversary (1998-2018) in 2019 with a big party, attended by many friends and relatives, our now almost "grown-up" children, and our neighbors. Almost all of them had also been our diligent helpers over the years, contributing to building our "Eselberg" into what it is today. Thanks again to everyone! But now, let's start from the beginning! Even after 20 years, we have implemented further ideas, but have also had to carry out further renovations and upgrades:
-
Easter: The access road was repaired with four gravel trucks sponsored by the municipality and several vans carrying white gravel, which Michele, Luca, and Marcus installed. It looks great now!
-
Securing the small, detached extension to the barn (future sauna) with a large concrete foundation.
-
Whitsun holidays: Construction of the retaining walls on the lower terrace, assembly of the wooden pergolas in the courtyard and on the terrace
-
Summer holidays: Laying tiles in the outdoor bathroom and installing steps
2019-2024
"Sauna" - that too is a multi-year project.
2019
-
Summer: Construction of the ring beam
2021
-
June: Roof rafters and covering with thick insulation and old clay tiles. Thanks to Thilo and Markus!
-
Summer: Bitumen membrane and roof tiles, gutter, thanks to Luca!
2022
-
February: Start of interior construction, partition wall, testing of the sauna heater - it works!
-
Easter - Summer: Interior insulation
-
Autumn break: Interior paneling with Douglas fir. Thanks Luca for your hard work and perseverance!
2023
-
February: Construction and installation of the loungers :) Except for the still missing terracotta floor, we now have a fully functional wood-fired sauna! Sweat!
2024
-
February: Completion with new terracotta flooring. The first time the air temperature reached 90 degrees Celsius, thus achieving the goal!
2019-2025
Vineyard
2019
-
Easter: Digging out the soil for the 4 rows to improve soil aeration and loosening after replanting following the next winter. Thanks to Luca!
2020
-
Summer: Filling in the open trenches and setting the vine stakes. Thanks to Michele, without whom we wouldn't be able to rent an excavator anymore without a "driving license"! Italian bureaucracy is also increasingly making its presence felt. If they only knew that we've already let 9-year-old Lucas operate an excavator :)
2021
-
February: Planting of the first 86 "PIWI" (fungus-resistant) vine seedlings: 43 white "Bronner" and 43 red "Carbernet Cortis"
-
April: Increase to a total of 100 seedlings and construction of a fence to protect against deer and wild boar, together with the neighbor Matteo and his tractor.
-
Summer: Installation of an irrigation system (better late than never, the first "losses" due to frost and heat are already becoming apparent). Thanks to the head installer, Luca!
2022
-
April: Planting approximately 20 seedlings that were pre-grown in flowerpots at home.
-
Summer: now the irrigation system is computer-controlled :)
2023
-
April: Replanting a few seedlings - Frost and heat caused the young vines to die in 2021 and 2022.
-
Summer: first grape harvest. And here too, the saying holds true: good things come to those who wait!
2024
-
February: Preparing a fifth and sixth row, which will be planted with the PIWI variety "Sauvignier Gris" at Easter!
-
Summer: Three-quarters of the newly planted vines have withered. A "defect" in the irrigation system... it simply doesn't work without electricity. Therefore: Please do not make any changes in the energy room!
2025
-
March: Planting 45 new vines, checking the irrigation system, and sending lots of watering requests to our neighbor Nicola!
2020
The first year of the coronavirus pandemic
-
After spending the carnival holidays on the Eselsberg (and already being "afraid" :) of not being allowed to travel back to Germany), entry into Italy was no longer permitted until mid-June.
-
Summer holidays: Re-roofing the northwest side of the house around the chimney after several leaks, now with a bitumen underlayment. Thanks to Matteo, Luca and Maxi!
-
Tiling of the pergola in the courtyard and at the "sunset spot" above the tractor garage.
-
Image 1: The Teatro del Silenzio on the day of Andrea Bocelli's concert, which was later cancelled due to Corona.
2021
-
February: Replacement of the southeastern gutter, which had been torn away by a winter storm...
-
Whitsun: This time, our neighbor Matteo mows the grass around the house.nd ums Haus.
-
Summer: Continuing the repointing of the interior walls—specifically in the "Giallo" room—as well as the terrace wall.
-
Autumn break: Cutting down the magnificent, though now withered, giant flower stalk of our agave on the upper terrace.
2022
The first aluminum window shutters
-
January: The grouting of the interior walls continues! This time, room "Rosa"
-
February 25th: Finally, the notarized contract between Sören and Marcus was signed in Volterra, still under Corona restrictions, but with the added threat of war! What a crazy world! Thank God we can relax in the evenings by the open fireplace with a glass of wine :(
-
Easter: Re-roofing of the southeast-facing house, thanks also to Christian!
-
Pentecost: First newly assembled aluminum window shutters on the back of the barn - in keeping with old tradition, these also come from a demolished house and we are giving them a new purpose!
-
Summer: connecting steps to the terrace, start of assembly and hanging of the first large aluminum window shutters in the ground floor seminar room, which will gradually replace the dilapidated wooden shutters.
2023
-
More newly assembled large aluminum shutters for the dining room, seminar room, barn, and "Grande" room. First small shutters on the house: Rosa room and "Library".
-
Autumn holidays: Third (!) reconstruction of the collapsing natural stone wall at the herb terrace, this time with a concrete foundation!
2024
-
January: Planting a "large" palm tree and 10 more olive trees as an extension of the existing olive grove - now we have approximately 65 olive trees, many of which are already over 20 years old!
-
February: Summers are getting hotter! We'll have an overflow rainwater cistern dug next to our pond.
-
Summer: Installing the new (used) small aluminum window shutters in the remaining rooms (pictures to follow).